Fortec was engaged for de-vegetated of the quarry crest as well as installation of steel mesh and geofabric to promote crest stability.
Safety concerns were raised over the stability of the crest due to small rocks falling from height into the amphitheatre.
A geotechnical report released in 2010 suggested that the crest of the quarry be de-vegetated and a steel mesh and geofabric be installed to promote crest stability.
The amphitheatre is located in an old limestone quarry located in the Town of Cambridge. The venue is used extensively between October and May for a range of events from ballet to concerts and large weddings.