Completed in 1972, this concrete bridge is cable-stayed with a semi-fan system. Located in Perth’s CBD, it functions as a bicycle and pedestrian crossing.
The project works included the installation of a new pre-cast concrete mast, new cable stays, along with LED feature lighting on the mast and deck.