Fortec was engaged by LMCC to strengthen, and undertake upgrade works for the Cooranbong Bridge crossing over Dora Creek.
This bridge provides a critical freight link within south-western growth area of Lake Macquarie.
The bridge is a two-way, steel and concrete composite bridge constructed in the 1960s utilising existing concrete foundations originally constructed in the 1900s.