Fortec was engaged by MRWA to demolish a 3 span bridge and construct a new 2 span concrete bridge in its place, while maintaining the traffic flow over a bypass road.
Coalseam Road Bridge
Project Overview
Fast Facts
- CLIENTMain Roads WA
- LOCATIONMingenew, WA
Scope of Works
- Construction 120m long bypass road with bitumen seal and 900mm culvert pipes
- Demolition of existing 2 span bridge
- 16 bored foundation piles
- Concrete foundations for piers and abutments
- 4m high monolithic pier with headstock
- 2 abutments with wing walls
- 26 pretensioned 12T precast bridge beams
- Embankment construction to receive Subbase and Basecourse
- Rock protection to both abutment
- 1400sqm earthworks to road alignment
- Asphalt placement to bridge deck
- Bitumen placement to Basecourse
Highlights
- Installation of 26 pretensioned 12T precast bridge beams within a record time of 4 days
- 381 cubic meter concrete to a remote location and to MRWA Specifications