Fortec was contracted by FMG to complete the design and construction of an existing Reinforced Earth segmental wall that had weakened/failed over time in the Pilbara region.
The existing Concrete Segmental Wall showed signs of failure and movement which could lead to a major wall failure.
Fortec developed, designed, modelled, tested, and installed a practical solution to repair and stabalise the existing wall.