Bridge 856 is located just south of Port Hedland. It has 19 spans with a total of 84 bearings that needed to be replaced in a tight 8 week contract period.
Main Roads Pilbara region utilised our expertise to replace the existing bridge bearings with new elastomeric bearings, including keeper plates.