The Bibbulmun Track crossed the Murray River on the Long Gully Bridge which was lost in a fire in 2015.
This is a new suspension bridge designed to replace it and maintain an all year round crossing for walkers.
This bridge will be built in two stages, stage one – the footing and stage two – the above ground cables and steel structure.
The Department of Parks and Wildlife engaged Fortec to construct the pedestrian bridge footings over the Murray River on the Bibbulmun Track.