Fortec was engaged by MRWA in May 2022 to conduct extended improvement works to Bridge 4016 over the Arthur River.
The bridge is a 52m long, 8 span timber structure at 8.8m wide, with gravel decking and bitumen sealing.
Fortec was engaged by MRWA in May 2022 to conduct extended improvement works to Bridge 4016 over the Arthur River.
The bridge is a 52m long, 8 span timber structure at 8.8m wide, with gravel decking and bitumen sealing.